Buyer preparation tool

PV junction box automation project checklist.

Use this checklist before requesting a quotation. It helps SOLARGY CO., LIMITED match the right automation modules, process route, footprint, capacity plan, and documentation scope for your factory project.

Contact SOLARGY CO., LIMITED WhatsApp:+86 1351 100 8242 Email: [email protected] Website: solargyautomation.com

Information to prepare

Send these details for a faster technical proposal.

If some details are not final, send the best available information. SOLARGY CO., LIMITED can recommend the automation level and line configuration after reviewing your target.

1. Product and Process

  • Junction box drawing, sample photos, or 3D model if available.
  • Three-piece, integrated, or custom junction box structure.
  • Diode type: modular diode, cylindrical diode, or other design.
  • Assembly process: riveting, resistance welding, soldering, or mixed process.

2. Cable and Connector

  • Cable length range and cable specification.
  • Connector type, terminal type, and crimping requirements.
  • Stripping length, screwing requirement, and cable presentation requirement.
  • Need for clipping, knotting, coiling, or final cable arrangement modules.

3. Capacity and Layout

  • Target output: under 1000, 1000-1200, 1200-2000, or above 2000 pcs/hour.
  • Available floor space and preferred line direction.
  • Factory voltage, air supply, and utility constraints.
  • Expected number of operators and shift plan.

4. Quality and Documentation

  • Required CCD inspection, diode testing, laser marking, sorting, and data output.
  • Destination market and buyer audit requirements.
  • CE documents, UL component records where applicable, electrical drawings, pneumatic diagrams, manuals, and packing files.
  • Factory acceptance test expectations and video/photo evidence requirements.

Expected output from SOLARGY CO., LIMITED

What the proposal can include.

A

Recommended Line Configuration

Suggested modules, automation scope, process flow, and capacity assumptions based on your product and output target.

B

Commercial and Delivery Scope

Quotation, delivery scope, packing direction, spare parts list, and documentation plan according to the final configuration.

C

Commissioning Discussion

Remote support plan, operator training guidance, and optional onsite commissioning discussion for overseas factory projects.

Ready to discuss?

Send the checklist details to SOLARGY CO., LIMITED.

You can email drawings and project notes, or start with WhatsApp if the project is urgent.